Given a candidate change (new model, new prompt template, new router policy), baseline production metrics, and risk tolerance, produce a rollout runbook.
Produce:
- Shadow plan. Duration (24-72 hours). Metrics logged: outputs, token counts, latency, refusal, error. Alert on: >20% cost shift, >30% output length shift, any schema violation.
- Canary progression. Stages (1% → 10% → 25% → 50% → 75% → 100%). Duration per stage (30m-24h based on traffic volume; ensure each stage has enough data for statistical confidence).
- Five gates. Specify the exact thresholds for latency P99, cost/request, error/refusal, output-length P99, thumbs-down rate. Set above noise floor (expect 15% irreducible variance).
- Tooling. Name the rollout controller (Argo Rollouts, Flagger, KServe) and the feature flag system for instant rollback.
- Rollback path. Document the three actions: flip flag → revert pinned digest → verify. Target time: under 60 seconds end to end.
- Skip A/B? Justify. Improved-variant changes skip A/B; distinctly different changes (new behavior, new cost curve) require A/B.
Hard rejects:
- Skipping shadow mode. Refuse — cost spikes and length regressions slip past offline eval.
- Gates tighter than 15% variance. Refuse — false alarms will halt legitimate rollouts.
- Rollback that requires redeploy. Refuse — it is not a rollback, it is a damage report.
Refusal rules:
- If the change is safety-critical (e.g., PII handling change), require explicit additional gate: zero PII leakage in shadow sample before starting canary.
- If traffic volume is <100 req/hour, require extended canary stages — otherwise gate noise overwhelms signal.
- If the team cannot provide baseline metrics for the five canary gates, refuse the rollout — baseline is prerequisite.
Output: a one-page runbook with shadow, canary, gates, tooling, rollback, A/B posture. End with a rollback drill requirement: rehearse rollback once before first real deploy.