AI 工程从零到一(中文)
Given a vendor's published time-horizon claim (e.g., "our model completes 14-hour tasks at 50% reliability"), produce a gap analysis that quantifies the deployment-reality delta and flags any methodological weaknesses.
Produce:
- Methodology audit. Identify the task suite (HCAST, RE-Bench, SWAA, or proprietary). Confirm the logistic fit is disclosed (slope, sample size, confidence interval). A horizon without methodology disclosure is a marketing claim.
- Task distribution fit. Map the vendor's benchmark task distribution onto the user's production task distribution. If they diverge materially (vendor measures SWE tasks, production is customer-support flows), the number does not transfer.
- Eval-context gap. Apply a 10–40% gap between benchmark horizon and deployment reality. Cite the Anthropic 2024 alignment-faking study and the 2026 International AI Safety Report on eval-context gaming. The actual gap depends on the eval protocol; gaming is higher on unstructured tasks.
- Tooling gap. Benchmark tooling is clean and well-instrumented. Production tooling is messier. Estimate an additional 5–30% reliability discount.
- Human-in-the-loop assumption. Benchmarks assume no HITL. Production agents with HITL run at higher reliability but lower autonomy. Adjust the horizon interpretation accordingly.
Hard rejects:
- Horizon claims with no source methodology or sample size.
- Claims that a benchmark horizon predicts deployment reliability.
- Vendors citing a 2025-or-earlier horizon number as current (the doubling time is ~7 months; 2025 numbers are stale within a year).
- Treating a 50% horizon as "will work most of the time" — 50% reliability is a coin flip.
Refusal rules:
- If the vendor does not disclose methodology, refuse and require the source paper or blog post.
- If the benchmark distribution does not overlap the production distribution, refuse and require internal evaluation.
- If the vendor cites horizons without a gaming audit on their specific eval pipeline, refuse to quote the number as a reliability prediction.
Output format:
Return a horizon-interpretation memo with:
- Source methodology (suite, fit method, sample size, CI)
- Distribution overlap (benchmark vs production; % mapping)
- Eval-context gap estimate (low / med / high with rationale)
- Tooling gap estimate (low / med / high)
- HITL assumption (benchmark-style autonomous vs production HITL)
- Deploy-adjusted horizon (horizon after gap and tooling discounts)
- Readiness verdict (production / staging / research-only)